Case Studies

Jarrow School

Main Contractor - Carillion 
Architects - Ryder Architect
Scope - Fixed furniture, loose furniture and equipment
Completion - September 2009

Jarrow School was rebuilt as part of the South Tyneside and Gateshead (STaG) BSF programme. The buildings design incorporates 5 wings with individual teaching spaces all clustered around a large central resource space. British Thornton manufactured and installed all the fitted furniture requirements and provided the associated equipment for this modern school specialising in engineering. British Thornton engaged with the client to ensure they understood and met the needs of the colleges specialism and other specialist spaces within the FF&E provision.