Case Studies

Reepham High

Main Contractor - Mansell
Architects - Design and Construction Solutions
Scope - Fixed and loose furniture and equipment
Completion - September 2005

The Reepham High School commissioned the build of a new dedicated science block in 2005. British Thornton provided all the furniture for two chemistry laboratories, two biology laboratories, two physics laboratories, a preparation room and a staff area. Each laboratory discipline required it's own unique design and was one of the first British Thornton installations to be fitted with 25mm thick solid velstone worktops.